Jiangsu Antai New Energy Technology Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Qian Charles
  • Company Name : Jiangsu Antai New Energy Technology Co., Ltd.
  • Tel : 86-523-80707699
  • Fax : 86-523-80706388
  • Address : Jiangsu,Jingjiang,No.9, Liuzhugang Road, Xingang Park Zone, Jingjiang City, Jiangsu Province
  • Country/Region : China
  • Zip : 214513

Coal Gasification Power Plant 1MW to 20MW

Coal Gasification Power Plant 1MW to 20MW
Product Detailed
Related Categories:Industrial Power Supply
The biggest and the most professional coal gasification power plant EPC supplier in China. Coal Gasification Power Generation Plant JAE’s coal gasification system (abbreviated as CGPS) is a kind of advanced power generating system integrating coal gasification technology and efficient gas engine. CGPS includes coal gasification (coal gasifier) and purification (detarrer, desurfuration equipment) and coal gas power generating(coal gas engine). Waste heat boiler and steam turbine may also be chosen to make a gas-steam combined cycle power generating system. The process of CGPS : Coal is converted to low BTU coal gas. Sulfur content, nitrogen oxides, dust are removed in the coal gas purification section. The clean coal gas is then fired to generate electricity in gas engine. Exhaust gas of gas engine may be used by waste heat boiler to produce hot water or steam, which may be used in lithium bromide chiller. Coal gasification power generating system is a promising power generating system for its high power generating efficiency and good environmental characteristics. Efficient gas engine and clean coal gasification are combined in CGPS. Modulization is also adopted in CGPS. The power generating capacity is ranging from 1.0MW to 20MW. Two-stage coal gasifier (1MW~3MW) is used in CGPS. 500rpm~600rpm gas engine and Siemens generator are chosen in our gas generator sets (400KW, 500KW, 800KW, 1000KW, 1200KW). Comparing with other conventional power generating system, JAE-CGPS is characteristic of:1). Short project execution period. The power plant is normally started up within 5~6 months after contract signing. 2). Low investment (including equipment, land, civil work and installation).3). Easy operation. CGPS may be started or stopped any time. The switch time is very short.4). Low water consumption.5). Low operation and maintenance cost. Common technical workers are competent.

6). Less contaminants. CGPS is more environmental friendly.

 

Coal Gasification Power Plant 1MW to 20MW

Verified Information This information is Verified by Bureau Veritas and validity period is 2012/09/18 --- 2013/09/18 All the information below may covers both Gold Supplier and its related companies , Their Relationship will be affirmed according to china laws and regulations , also it will be clearly display in the full report >> Production Capacity: Product line name Production Line Capacity Actual Units Produced(Previous Year)
Generator Set 60 Sets Per Month 200 Sets
Export Market Distribution: Market Revenue(Previous Year) Total Revenue (%)
South America USD 50,000,000 66.67
Southeast Asia USD 15,000,000 20.0
Central America USD 9,000,000 12.0
South Asia USD 1,000,000 1.33
Production Machinery: Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Deep Hole Boring Machine T2150 1 4.0 Acceptable
Radial Drilling Machine Z3080x25 15 4.0 Acceptable
Floor Type Boring and Milling Machine TK6920/L120 4 4.0 Acceptable
Planner B220 3 4.0 Acceptable
Lathe C61125A 12 4.0 Acceptable
Crank Lathe Not Provided 2 4.0 Acceptable
Longmen Milling Machine XKA2130 3 4.0 Acceptable
Milling Machine Not Provided 10 4.0 Acceptable
CNC Lathe CAK6150C 18 4.0 Acceptable
Testing Machinery: Machine Name Brand & Model No. Quantity Number of Year(s) Used Condition
Bore Dial Indicator 0-500mm 20 4.0 Acceptable
Photometer JD3 1 4.0 Acceptable
Raster Indicator Verification Instrument JDY-10 1 4.0 Acceptable
Digital Length Measuring Machine JDS2000 1 4.0 Acceptable
Vernier Caliper 0-500mm 60 4.0 Acceptable
Outside Micrometer 0-200mm 30 4.0 Acceptable
Production Flow: 1.Drilling 2.Boring 3.Planing 4.Lathing 5.Milling 6.Assembly 7.Testing 8.Finishing 9.Packing


Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.